Installation
CoEnergy manufactures CHP units in their Massachusetts facilities. The unit then ships direct to the site ready for integration. CoEnergy manages the building permits and licensed contractors during construction. We maintain constant communication with the facility during this phase and will work with the facility manager to minimize impacts during installation such as scheduling outages during off hours.
Alternative Energy Credit Metering
Our CHP systems come with instrumentation to measure all energy flows – natural gas feed to the engine, hot water energy from the engine, and electrical energy from the generator. All measured variables are recorded by a data logger which links to a webpage for independent third party verification.
Scope of Services
Our Amerigen CHP unit is the result of years of fine tuning, rework and testing. We provide a complete turnkey system designed specifically for each individual site using top of the line components, including reliable industrial engines, advanced controls for seamless operations, and complete metering packages for billing and Alternative Portfolio Standard credit requirements.
Building Permit
Plumbing and Gas Fitting Application
Site Work
Electrical and Mechanical
CHP Delivery/Installation
Metering Packages
Commissioning




Case Studies
Learn how cogeneration has worked at customer facilities.
Massachusetts College of Pharmacy (Foster St.)
OVERVIEW Having already experienced the benefits of two Co-Energy CHP units, in 2015 MCPHS continued searching for energy efficiency improvements in their academic and dormitory buildings. MCPHS chose to partner once again with Co-Energy America to develop a CHP...
St. Mary’s d’Youville Pavilion
OVERVIEW Covenant Health Systems has installed multiple Co-Energy CHP systems at their assisted living facilities. Sites range in size from 60kW, 85kW to 150kW units. In 2015, when Covenant was looking to expand their eco-friendly and energy saving efforts at St....
Pine Street Inn
OVERVIEW The Pine Street shelter in Boston’s South End has significant hot water needs for the showers, dishwashing and laundry. After thoroughly assessing the loads of the building, Co-Energy America installed a turnkey Amerigen 85 kW CHP system. The Pine Street Inn...
Dedham Health & Athletic Complex
OVERVIEW As DHAC’s business has grown over the years, the property has needed multiple renovations and expansions, and recently through a comprehensive energy efficiency project, the old boilers were replaced and a CHP system was installed. An Amerigen 8150 CHP was...
Southeastern Regional Vocational-Technical H.S.
OVERVIEW In 2009 SEVT in collaboration with a national ESCO and Co-Energy America, developed a plan for energy savings. The school underwent an array of energy efficient modifications ranging from lighting retrofits and controls, water conservation, waste oil heaters...
Bethany Health Care Center
OVERVIEW In addition to high utility bills, Bethany Health Care Center was regularly plagued with brown-outs (power shortages from the electricity grid). For a critical care facility, attempting to operate during such brownouts is very difficult and dangerous. As a...
Massachusetts College Of Pharmacy
OVERVIEW The Boston campus of MCPHS had been operating a boiler that was sized primarily for operating in winter months, but was vastly oversized for operations during summer months. In 2008 the college chose Co-Energy America to analyze and design a solution. Based...
Youville Place & Mary Immaculate
OVERVIEW Covenant Health Systems was looking for ways to reduce energy costs and become more eco-friendly, so they contracted Co-Energy America to install a 150 kW CHP system at Youville and an 85 kW CHP at Mary Immaculate. The payback on these investments was two...
Cape Codder Resort & Spa
OVERVIEW Co-Energy America has worked with the Cape Codder on multiple occasions to develop clean energy solutions. The resort runs two Co-Energy CHP units 24/7 in order to alleviate their large consumption of hot water and electricity. According to the resort, the...